Plaster Ceiling Repairs
We recently responded to a site where significant water ingress had compromised the structural integrity of this ceiling, leading to partial failure. To prevent further collapse and preserve as much of the original fabric as possible, our team immediately installed emergency structural propping. By stabilising the area first, we ensured a safe environment for our craftsmen to begin the delicate process of restoration and repair.
5 days ago1 min read


Crittall Window Repairs - Part 2.
We were commissioned to restore these Crittall windows. We conducted lead paint testing, replaced broken panes with authentic heritage glass, and applied fresh putty before a final redecoration. See the original condition alongside our repairs below.
Mar 41 min read


Crittall Window Repairs - Part 1.
We were commissioned to restore these Crittall windows. We conducted lead paint testing, replaced broken panes with authentic heritage glass, and applied fresh putty before a final redecoration. See the original condition below.
Feb 171 min read


Stonework Restoration - Part 3.
We recently worked on a listed building where the façade was being retained and restored. We were asked to clean the stone and install new lead sheets to the cornice. These photos show the new lead sheets in more detail.
Feb 101 min read


Stonework Restoration - Part 2.
We recently worked on a listed building where the façade was being retained and restored. We were asked to clean the stone and install new lead sheets to the cornice. These photos show the stone before and after our restoration works.
Jan 281 min read


Stonework Restoration - Part 1.
We recently worked on a listed building where the façade was being retained and restored. We were asked to clean the stone and install new lead sheets to the cornice. This is what the stonework looked like before our restoration.
Jan 201 min read


Stone Pillar Repairs - Part 3.
We were asked to repair this stone pillar that was knocked down by a vehicle. We repaired the pillar with new stone we cut and built it to match the original pillars, using a reclaimed top. Here you can see the finished work alongside how it looked at the beginning. After Before
Jan 121 min read


Stone Pillar Repairs - Part 2.
We were asked to repair this stone pillar that was knocked down by a vehicle. We repaired the pillar with new stone we cut and built it to match the original pillars, using a reclaimed top. Here you can see the process of rebuilding the pillar.
Dec 9, 20251 min read


Stone Pillar Repairs - Part 1.
We were asked to repair this stone pillar that was knocked down by a vehicle. Here’s how it looked before our repairs.
Dec 2, 20251 min read


Lead Repairs
Further to a quinquennial report, it was noted that water was seeping into the bell chamber of this church. Some minor cracking was identified within the original lead sheets. This was rectified using lead patches. Here you can see before and after our repairs. Before After
Nov 18, 20251 min read