Curved Wall - Part 3.
We were asked to widen an entrance between two walls as a new path was being installed. Originally, the walls were squared off by the entrance. We took the whole corner off and rebuilt it with a curve. Here you can see the before and after photos. After After Before Before
Nov 11, 20251 min read


Curved Wall - Part 2.
We were asked to widen an entrance between two walls as a new path was being installed. Originally, the walls were squared off by the entrance. We took the whole corner off and rebuilt it with a curve. Here you can see the work in progress.
Nov 4, 20251 min read


Curved Wall - Part 1.
We were asked to widen an entrance between two walls as a new path was being installed. Originally, the walls were squared off by the entrance. We took the whole corner off and rebuilt it with a curve. Here you can see how the walls on either side looked before we started.
Oct 28, 20251 min read


Pinnacle Repairs - Part 2.
Further to a quinquennial survey, it was found there was movement within these church pinnacles. After an intrusive survey, it was found that rusted iron cramps were present. The cramps were then removed and replaced with stainless steel. Here you can see the stainless steel replacement cramps, along with some stone repairs.
Oct 21, 20251 min read


Pinnacle Repairs - Part 1.
Further to a quinquennial survey, it was found there was movement within these church pinnacles. After an intrusive survey, it was found that rusted iron cramps were present. The cramps were then removed and replaced with stainless steel. Here you can see the removed iron cramps and the stainless steel replacements. Rusted iron cramps that were removed Pinnacle with stainless steel replacement cramps
Oct 14, 20251 min read


Slate Roof - Part 2.
This slated roof was found to be leaking in several areas. Weathered and damaged slates were identified and replaced with new slates....
Oct 7, 20251 min read


Slate Roof - Part 1.
This slated roof was found to be leaking in several areas. Weathered and damaged slates were identified and marked with a white cross, as...
Oct 1, 20251 min read


Archway Repairs - Part 2.
We carried out repairs to this archway using tinted mortar to match the existing brick colour which had worn down due to severe...
Sep 8, 20251 min read


Archway Repairs - Part 1.
We carried out repairs to this archway using tinted mortar to match the existing brick colour which had work down due to severe...
Sep 1, 20251 min read


Bird Spike Installation
We were asked to install these bird spikes around the building and right above the entrance door to prevent customers from being covered...
Aug 27, 20251 min read