top of page


Pinnacle Repairs - Part 2.
Further to a quinquennial survey, it was found there was movement within these church pinnacles. After an intrusive survey, it was found that rusted iron cramps were present. The cramps were then removed and replaced with stainless steel. Here you can see the stainless steel replacement cramps, along with some stone repairs. Find out more here.
Oct 21, 20251 min read


Pinnacle Repairs - Part 1.
Further to a quinquennial survey, it was found there was movement within these church pinnacles. After an intrusive survey, it was found that rusted iron cramps were present. The cramps were then removed and replaced with stainless steel. Here you can see the removed iron cramps and the stainless steel replacements. Find out more here. Rusted iron cramps that were removed Pinnacle with stainless steel replacement cramps
Oct 14, 20251 min read


Slate Roof - Part 2.
This slated roof was found to be leaking in several areas. Weathered and damaged slates were identified and replaced with new slates. Here you can see how the roof looked before and after our repairs were carried out. Find out more here. After After Before Before
Oct 7, 20251 min read


Slate Roof - Part 1.
This slated roof was found to be leaking in several areas. Weathered and damaged slates were identified and marked with a white cross, as you can see from the photos. This is how the roof looked before our repairs were carried out. Find out more here.
Oct 1, 20251 min read


Window Archway Repairs - Part 2.
We carried out repairs to this archway using tinted mortar to match the existing brick colour which had worn down due to severe weathering. Here’s what it looked like before and after our repairs. Find out more here. After After Before
Sep 8, 20251 min read


Window Archway Repairs - Part 1.
We carried out repairs to this archway using tinted mortar to match the existing brick colour which had work down due to severe weathering. Here’s what it looked like before our repairs. Find out more here.
Sep 1, 20251 min read


Bird Spike Installation
We were asked to install these bird spikes around the building and right above the entrance door to prevent customers from being covered in guano! Find out more about our services here.
Aug 27, 20251 min read


Gable Repairs
The repairs we carried out included steam cleaning, mortar repairs, bird protection, and painting. All repairs to the gable were carried out via cherry picker access. Find out more about our services here.
Aug 18, 20251 min read


Brick Wall Repairs - Part 3.
We were asked to repair a section of deteriorated brickwork and defective mortar joints from this wall. We replaced the deteriorated brickwork with reclaimed bricks to match the original. It was all fixed and pointed using lime mortar to match the original. Once it was found to be secure, the original render was left in situ. We pointed round it to ensure no water ingress. Here you can see the finished product versus how it started. Learn more about how the wall looked before
Aug 11, 20251 min read


Brick Wall Repairs - Part 2.
We were asked to repair a section of deteriorated brickwork and defective mortar joints from this wall. We replaced the deteriorated brickwork with reclaimed bricks to match the original. It was all fixed and pointed using lime mortar to match the original. Here you can see the work in progress. Learn more about how we finished our restoration of this brick wall here.
Aug 4, 20251 min read
bottom of page